{"id":7092,"date":"2026-11-21T02:44:34","date_gmt":"2026-11-21T07:44:34","guid":{"rendered":"https:\/\/www.lkbelt.com\/?p=7092"},"modified":"2026-11-21T05:17:56","modified_gmt":"2026-11-21T10:17:56","slug":"vacuum-conveyor-belt-hole-patterns","status":"publish","type":"post","link":"https:\/\/www.lkbelt.com\/zh\/vacuum-conveyor-belt-hole-patterns\/","title":{"rendered":"Vacuum Conveyor Belts: Hole Patterns, Materials and Replacement Specifications"},"content":{"rendered":"<p>A packaging line carries thin printed sheets beneath a camera. After a replacement belt is fitted, the sheets shift sideways even though the belt width and speed appear unchanged. The problem may be in the new perforation pattern, the vacuum-bed interface, a leak, or the product itself\u2014not necessarily the motor or the new belt material.<\/p>\n<p><strong>Select a vacuum conveyor belt by matching its finished hole layout and belt construction to the product footprint, vacuum zones, support bed and installed belt path.<\/strong> Confirm hole diameter, pitch, row position, belt length, surface, underside, reinforcement, splice and the location of the vacuum window. Then use the actual equipment and representative products to approve holding and release before ordering production quantities.<\/p>\n<p>A vacuum belt is only one part of a hold-down conveyor. The same perforated belt can perform differently over another plenum or with a different sheet size. <strong>This article specifies the replacement belt; it is not a method for designing a vacuum pump or guaranteeing hold-down force.<\/strong><\/p>\n<h2 id=\"what-is-a-vacuum-conveyor-belt\">What Is a Vacuum Conveyor Belt?<\/h2>\n<p>In a vacuum belt conveyor, air is drawn through selected openings in the moving belt and a supported vacuum zone below it. The resulting pressure difference helps hold a workpiece against the belt during transport, positioning or a change of elevation. The moving belt supplies the conveying surface; the vacuum chamber, bed passages, ducting and blower are separate parts of the machine.<\/p>\n<p>This is different from <strong>pneumatic vacuum conveying<\/strong>, which draws loose powders or bulk materials through a pipeline. A buyer asking for a replacement vacuum <em>belt<\/em> should identify a physical moving belt with a specified hole pattern, not a hose or a bulk-material pneumatic conveyor.<\/p>\n<p>Dorner&#8217;s <a href=\"https:\/\/www.dornerconveyors.com\/solutions\/vacuum-belt-conveyors\">vacuum belt conveyor overview<\/a> describes perforated belts working with a specially designed vacuum bed. It also explains why suction-zone arrangement and belt holes are application-specific. Those system-level principles help define the information a replacement-belt supplier needs; they do not establish the specifications of an LKBELT product.<\/p>\n<p>Vacuum hold-down is often considered for thin paper, plastic film, carton blanks, lightweight packs and small parts. The useful distinction is not simply whether a part is light. Consider whether it is porous, whether it covers the holes, whether the contact face can be marked, and whether the required position can be maintained during acceleration and release.<\/p>\n<h2 id=\"start-with-the-product-and-vacuum-bed-not-the-holes\">Start With the Product and Vacuum Bed, Not the Holes<\/h2>\n<p>Before drawing the replacement belt, document the workpiece&#8217;s minimum and maximum dimensions, thickness, surface condition, mass, orientation and permitted movement. Include the smallest item, since it may cover fewer active holes, and the most porous or irregular item, since leakage conditions may differ. Record acceleration, speed, inclines, product spacing and the point where the item must release.<\/p>\n<figure class=\"wp-block-image lkbelt-blog-photo\"><img loading=\"lazy\" src=\"https:\/\/www.lkbelt.com\/wp-content\/uploads\/2025\/11\/IMG_1749.jpg\" alt=\"Close-up of shaped openings and edge perforations on a conveyor belt sample\" width=\"750\" height=\"800\" decoding=\"async\"><\/figure>\n\n<p>Next, locate the <strong>active vacuum zone<\/strong>. Some conveyors have several chambers or selectively controlled sections; others use a continuous bed with localized openings. Record the width and length of each zone, the bed grooves or ports, and the location of seals, rails and end pulleys. A hole that passes over an unported part of the bed does not necessarily provide useful suction at that instant.<\/p>\n<p>The equipment team should also establish which parts are responsible for performance. An item drifting on an existing belt may indicate contamination at the bed, a blocked hole, an unsuitable product footprint, a leak or an adjustment problem. Do not assume that increasing the number of holes will cure it. Increasing exposed open area can change leakage and the duty required of the vacuum source.<\/p>\n<p>For printing and carton machinery, LKBELT&#8217;s <a href=\"https:\/\/www.lkbelt.com\/zh\/applications\/printing-paper-packaging\/\">printing, paper and packaging application guide<\/a> helps distinguish sheet-feeding, positioning and finished-package transfer positions. Those are different machine duties; the application page is not proof that any particular LKBELT belt is approved for vacuum hold-down.<\/p>\n<h2 id=\"how-to-specify-vacuum-conveyor-belt-hole-patterns\">How to Specify Vacuum Conveyor Belt Hole Patterns<\/h2>\n<h3 id=\"hole-diameter-pitch-and-row-position\">Hole diameter, pitch and row position<\/h3>\n<p>Specify each opening with a dimensioned drawing rather than the phrase \u201cstandard perforations.\u201d Record hole shape and diameter or length and width, the <strong>longitudinal pitch<\/strong> along belt travel, transverse spacing across the width, row count, edge offsets and the reference datum. If the holes are staggered, include the row-to-row offset and orientation. If there are distinct zones or repeating groups, show the entire repeat.<\/p>\n<p>The crucial question is which openings fall beneath the product <strong>while it crosses the active vacuum zone<\/strong>. A large hole can remain uncovered by a narrow workpiece; a dense pattern can leave more holes exposed between widely spaced products. Either condition may change leakage. There is no reliable universal hole diameter, pitch or percentage of open area for all vacuum belt conveyors.<\/p>\n<p>The supplier should check the relationship between the hole pattern and the belt&#8217;s structural elements. On reinforced belts, punching can intersect textile plies or tensile members. On toothed or cord-reinforced timing belts, the location of the tensile cords and any cord-free regions may control where holes are permitted. Never authorize a new hole pattern through reinforcement simply by copying a drawing from another belt family.<\/p>\n<p>The <a href=\"https:\/\/www.alphabelt.de\/en\/Special-belts-refinement\/Vacuum-timing-belts\/\">vacuum timing-belt processing overview from Alphabelt<\/a> illustrates why base-belt selection, punching and machined suction pockets are separate design decisions. That supplier&#8217;s processing methods are not evidence of LKBELT&#8217;s approved manufacturing limits.<\/p>\n<h3 id=\"hole-phase-registration-and-the-finished-loop\">Hole phase, registration and the finished loop<\/h3>\n<p>For repeatable replacement orders, reference the perforation layout to the <strong>finished endless belt<\/strong>, not only a flat strip before joining. State the distance from a defined datum or joint reference to the first hole group, the repeat along the full circumference and the allowable position tolerance. Show whether any row is intentionally omitted near the joint, a guide or a sensitive contact point.<\/p>\n<p>Where the equipment registers products to holes, the workpiece pitch and belt pattern must agree with the actual motion sequence. A correct hole diameter combined with a shifted repeat can leave the product over a closed part of the bed at pickup. The installation team must confirm how the belt is phased and how the system establishes registration.<\/p>\n<p>Describe the complete drawing using named datums and dimensions. A photograph of several holes does not define the original pattern, and a used belt may be stretched or damaged. Use OEM records or an approved measurement method to resolve conflicting length and pitch information.<\/p>\n<h2 id=\"match-the-belt-material-underside-and-joint-to-the-machine\">Match the Belt Material, Underside and Joint to the Machine<\/h2>\n<p>A perforated belt is still a finished industrial conveyor belt. Its surface must contact the workpiece appropriately; its underside must work with the vacuum bed or support; and its body must pass around the installed pulleys. The drive may rely on friction or on a toothed positive-engagement system. These are not interchangeable constructions.<\/p>\n<figure class=\"wp-block-image lkbelt-blog-photo\"><img loading=\"lazy\" src=\"https:\/\/www.lkbelt.com\/wp-content\/uploads\/2025\/11\/H4c5a5bb513aa4c5aba6be430f27ce3525.jpg\" alt=\"Blue PVC conveyor belt with a pale textured underside\" width=\"750\" height=\"800\" decoding=\"async\"><\/figure>\n\n<p>LKBELT&#8217;s <a href=\"https:\/\/www.lkbelt.com\/zh\/product\/pvc-blue-flat-conveyor-belts-manufacturer\/\">blue PVC flat conveyor belt<\/a> is publicly shown with a glossy blue carrying face and fabric underside. Its page asks buyers to specify finished dimensions, joint and the conveyor arrangement. This provides a documented <strong>base material family for an initial review<\/strong>; it is not a verified vacuum-service construction. Ask the supplier to confirm whether the selected grade and reinforcement permit the proposed perforations and bed contact.<\/p>\n<p>A separate material reference is the <a href=\"https:\/\/www.lkbelt.com\/zh\/product\/pu-transparent-food-conveyor-belt\/\">transparent PU conveyor belt range<\/a>. The public page shows translucent roll material and separate listed PU grades, but does not establish that the pictured material is an approved vacuum belt. Review exact thickness, reinforcement, underside, permissible processing and pulley limits for the selected model rather than transferring figures from another range entry.<\/p>\n<h3 id=\"why-the-underside-matters\">Why the underside matters<\/h3>\n<p>The underside may slide over a vacuum bed and contact drive or return components elsewhere in the loop. The relevant interfaces can affect drag, wear, heat and belt tension. Note the support material, bed channels, wear strips, pulley diameter and any back-bending contact. Do not assume the product-facing coating also describes the bed-contacting surface.<\/p>\n<p>A replacement with matching length and width may still differ in thickness, edge finish, lateral guidance or reinforcement. Those changes can affect bed clearance and the ability of the belt to maintain the intended interface. Confirm any proposed change against the machine drawing, installed tensioning range and supplier limits.<\/p>\n<h3 id=\"check-the-splice-against-the-perforation-layout\">Check the splice against the perforation layout<\/h3>\n<p>Record the approved joint type, position, profile and finish, as well as whether the equipment can accept an endless belt at installation. A seam that is physically sound may still create a local thickness change or interfere with a vacuum window, scraper or small roller. Hole rows should not be placed across a critical joint region without engineering approval.<\/p>\n<p>LKBELT&#8217;s <a href=\"https:\/\/www.lkbelt.com\/zh\/conveyor-belt-splice-types\/\">conveyor belt splice guide<\/a> explains general joining options, but it does not approve a particular joint for a vacuum conveyor. Final acceptance must include the actual belt construction, machine path and vacuum requirements.<\/p>\n<h2 id=\"a-perforated-product-exampleand-its-limits\">A Perforated Product Example\u2014and Its Limits<\/h2>\n<p>LKBELT publishes a <a href=\"https:\/\/www.lkbelt.com\/zh\/product\/pu-dumpling-machine-conveyor-belt\/\">PU dumpling-machine conveyor belt with openings<\/a>. The photographs and product description identify a white PU carrying face, fabric underside, shaped openings and small holes along the edges. Its ordering instructions call for the opening pattern, edge offsets, finished dimensions and a machine drawing.<\/p>\n<p>This demonstrates why a <strong>dimensioned opening layout<\/strong> is more useful than a photograph when ordering a processed belt. The pictured openings serve a dumpling-machine application; the page does not describe vacuum hold-down. For a separate vacuum-belt enquiry, ask LKBELT to review the proposed base construction, perforation pattern and fabrication feasibility, and have the machine designer confirm vacuum-bed compatibility. Neither party should treat a similar-looking opening pattern as a performance approval.<\/p>\n<p>For parts with shaped openings, keep the opening purpose separate from the vacuum function. A slot may be needed for equipment clearance or product processing rather than suction. Hole appearance alone cannot establish why it was made.<\/p>\n<h2 id=\"vacuum-conveyor-belt-replacement-specification-matrix\">Vacuum Conveyor Belt Replacement: Specification Matrix<\/h2>\n<table>\n<thead>\n<tr>\n<th>Buyer decision<\/th>\n<th>Record from the installed system<\/th>\n<th>What can go wrong if omitted<\/th>\n<th>Approval required<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Product hold-down<\/td>\n<td>Minimum\/maximum product footprint, porosity, speed, release point<\/td>\n<td>Too few covered holes or uncontrolled leakage<\/td>\n<td>Representative holding and release trial<\/td>\n<\/tr>\n<tr>\n<td>Active vacuum bed<\/td>\n<td>Zone drawing, port\/groove locations, seals and chamber sequence<\/td>\n<td>Holes pass over inactive or mismatched passages<\/td>\n<td>OEM or system integrator confirmation<\/td>\n<\/tr>\n<tr>\n<td>Hole pattern<\/td>\n<td>Diameter\/shape, both pitches, rows, edge offset, datum and repeat<\/td>\n<td>Changed holding position or blocked\/unused holes<\/td>\n<td>Dimensioned drawing and pattern inspection<\/td>\n<\/tr>\n<tr>\n<td>Belt construction<\/td>\n<td>Carrying face, underside, reinforcement and thickness<\/td>\n<td>Wear, drag, loss of clearance or unsuitable processing<\/td>\n<td>Exact belt-grade and fabrication review<\/td>\n<\/tr>\n<tr>\n<td>Belt route<\/td>\n<td>Pulley sizes, support, guides, bending, tensioning travel<\/td>\n<td>Wrong finished size, bend stress or tracking changes<\/td>\n<td>Supplier and equipment approval<\/td>\n<\/tr>\n<tr>\n<td>Splice and registration<\/td>\n<td>Joint type, seam location, hole phase and full loop length<\/td>\n<td>Local obstruction or misplaced suction row<\/td>\n<td>Finished-belt check and approved installation<\/td>\n<\/tr>\n<tr>\n<td>Duty and maintenance<\/td>\n<td>Dust, moisture, cleaning, temperature and inspection access<\/td>\n<td>Blocked holes or coating\/joint damage<\/td>\n<td>Site maintenance and engineering approval<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>These are procurement checkpoints, not a universal design calculation. The vacuum source and chamber design remain system-level engineering responsibilities.<\/p>\n<figure class=\"wp-block-image lkbelt-blog-photo\"><img loading=\"lazy\" src=\"https:\/\/www.lkbelt.com\/wp-content\/uploads\/2026\/11\/conveyor-belt-finger-splice-detail-1024x411.jpg\" alt=\"Finger splice detail on a conveyor belt\" width=\"1024\" height=\"411\" decoding=\"async\"><\/figure>\n\n<h2 id=\"two-practical-selection-scenarios\">Two Practical Selection Scenarios<\/h2>\n<h3 id=\"scenario-a-printed-sheets-lose-registration-after-a-belt-change\">Scenario A \u2014 Printed sheets lose registration after a belt change<\/h3>\n<p>Imagine a packaging line in which printed sheets must pass a camera without drifting. The previous belt is removed and a new one matches its nominal width and colour. During a controlled trial, the smallest sheets move slightly at the inspection station.<\/p>\n<p>Maintenance first records the position and product conditions at which the movement appears. The team checks whether the replacement&#8217;s hole rows line up with the active bed, whether the sheet fully covers those rows, and whether any ports are obstructed or open to atmosphere. It also compares the splice phase, belt speed and measured installed path. A changed hole pattern is one hypothesis; a vacuum-system or handling fault remains possible.<\/p>\n<p>Procurement should not order a denser hole pattern immediately. Obtain the original hole drawing, bed drawing and accepted sample or first-belt test conditions. Resolve the cause with the OEM or system integrator, then specify the approved finished belt and its pattern tolerance.<\/p>\n<h3 id=\"scenario-b-a-vacuum-timing-belt-is-offered-as-a-flat-belt-replacement\">Scenario B \u2014 A vacuum timing belt is offered as a flat-belt replacement<\/h3>\n<p>Imagine a buyer requesting a \u201cperforated vacuum belt\u201d for a film-feeding machine. One supplier offers a fabric-backed flat belt; another proposes a toothed belt with perforations. The latter is not a simple material substitute: its tooth geometry, mating pulleys, cord layout, tracking, tension and available clearances must match a different drive system.<\/p>\n<p>The engineering team establishes whether the installed machine is friction-driven or positively engaged. For either design, it records film size, belt face, perforation datums, suction path and approved splice or endless construction. If the current system uses flat-belt pulleys, do not order a timing belt without an approved equipment redesign. Hold the production order until the machine and belt suppliers have resolved every deviation.<\/p>\n<p>Neither scenario is an actual LKBELT installation, and neither assumes a particular holding force or operating speed.<\/p>\n<h2 id=\"what-causes-poor-vacuum-belt-holding-after-replacement\">What Causes Poor Vacuum Belt Holding After Replacement?<\/h2>\n<p>A failure to hold the workpiece does not automatically mean that the new belt is defective. Use a documented inspection sequence under the equipment&#8217;s safe service procedure:<\/p>\n<ul>\n<li><strong>Confirm the product:<\/strong> Did footprint, porosity, surface finish, shape or handling speed change?<\/li>\n<li><strong>Inspect the belt:<\/strong> Are holes clear, correctly located and undamaged? Are the joint, edges or guides rubbing?<\/li>\n<li><strong>Check the bed interface:<\/strong> Do active openings align with the bed zones? Are visible seals, grooves or passages blocked or worn?<\/li>\n<li><strong>Check the system:<\/strong> Has the vacuum source, filter, hose, valve or operating sequence changed? Have qualified personnel verified the relevant system readings against the OEM requirements?<\/li>\n<li><strong>Review the installed geometry:<\/strong> Has belt tension, path, tracking or the relationship to the release point changed?<\/li>\n<\/ul>\n<p>Stop the equipment and isolate hazardous energy before hands-on inspection. Any powered diagnostic check must follow an approved safeguarded procedure by qualified personnel. Avoid changing vacuum settings or tension by guesswork: these actions can move a symptom without correcting the cause.<\/p>\n<p>For a problem that appears at a transition, review the <a href=\"https:\/\/www.lkbelt.com\/zh\/conveyor-belt-transfer-points\/\">conveyor belt transfer-point guide<\/a> separately. A transfer gap or release-timing issue is not always a hole-pattern defect.<\/p>\n<h2 id=\"what-to-include-in-a-vacuum-conveyor-belt-rfq\">What to Include in a Vacuum Conveyor Belt RFQ<\/h2>\n<p>A meaningful RFQ should let the supplier distinguish a simple replacement from a new perforation design and from a request to engineer an entire vacuum conveyor.<\/p>\n<ol>\n<li><strong>Equipment identity:<\/strong> Manufacturer, model, position on the line, drawing revision and original belt part number, where available.<\/li>\n<li><strong>Product and cycle:<\/strong> Smallest\/largest workpiece, material, porosity, weight, required orientation, speed, acceleration, transfer and release points.<\/li>\n<li><strong>Vacuum system reference:<\/strong> Active zone drawings, bed groove or port pattern, chamber sequence and original system acceptance requirements. The buyer should obtain these from the OEM or integrator.<\/li>\n<li><strong>Finished belt dimensions:<\/strong> Endless circumference and its measurement basis, width, thickness, tolerances, edge condition and available take-up travel.<\/li>\n<li><strong>Base construction:<\/strong> Exact coating\/grade, surface finish, underside, reinforcement or cord positions, plus any required tracking feature.<\/li>\n<li><strong>Perforation drawing:<\/strong> Hole type, diameter\/shape, longitudinal and transverse pitch, number of rows, edge offsets, datums, pattern repeat, direction and phase relative to the finished joint.<\/li>\n<li><strong>Joint and routing:<\/strong> Joint construction, permitted seam zone, pulley diameters, bending directions, guide positions and installation access.<\/li>\n<li><strong>Duty and documentation:<\/strong> Exposure to paper dust, moisture, oils or cleaning agents, required inspection criteria, samples, quantities and approval authority.<\/li>\n<\/ol>\n<p>Request a drawing review <strong>before<\/strong> the initial production batch. A first finished belt should be checked for dimensions, edge quality, hole position and joint, then tried under representative product, machine and safe operating conditions. Record successful holding <strong>and<\/strong> release, as well as any tracking or interface problems. A supplier may be able to quote a base material before the final vacuum-specific processing and approval have been confirmed; keep those statuses separate.<\/p>\n<h2 id=\"frequently-asked-questions\">Frequently Asked Questions<\/h2>\n<h3 id=\"is-a-vacuum-conveyor-belt-the-same-as-an-ordinary-perforated-conveyor-belt\">Is a vacuum conveyor belt the same as an ordinary perforated conveyor belt?<\/h3>\n<p>Not necessarily. Vacuum service requires holes and a compatible active vacuum-bed interface. A belt with openings made for another machine function is not automatically suitable for suction hold-down.<\/p>\n<h3 id=\"does-a-larger-hole-always-provide-stronger-holding\">Does a larger hole always provide stronger holding?<\/h3>\n<p>No. Effective holding depends on the product footprint, covered openings, leakage, pressure conditions and the engineered system. Larger or more numerous holes may expose more open area without producing the intended result.<\/p>\n<h3 id=\"can-a-pvc-or-pu-flat-belt-be-converted-to-a-vacuum-belt\">Can a PVC or PU flat belt be converted to a vacuum belt?<\/h3>\n<p>It may be technically feasible for a specific construction, but perforation location, reinforcement, joint, deck compatibility and operating duty must be assessed. Neither material name alone confirms processing capability or approved vacuum use.<\/p>\n<h3 id=\"what-is-the-most-important-drawing-for-a-replacement-vacuum-belt\">What is the most important drawing for a replacement vacuum belt?<\/h3>\n<p>The finished-belt drawing should identify the full loop dimensions, hole rows, pitch, edge offsets, datums, joint position and pattern repeat. The bed-zone and equipment drawings are also needed to verify compatibility.<\/p>\n<h3 id=\"are-vacuum-timing-belts-interchangeable-with-perforated-flat-belts\">Are vacuum timing belts interchangeable with perforated flat belts?<\/h3>\n<p>No. A timing belt requires its correct mating tooth geometry and pulley system. It should not replace a friction-driven flat belt without equipment-level review and approval.<\/p>\n<h3 id=\"how-can-buyers-verify-a-first-replacement-belt\">How can buyers verify a first replacement belt?<\/h3>\n<p>Compare the finished belt with the approved drawing, inspect the hole and joint arrangement, and run an OEM-approved trial with representative products. Confirm holding, release, tracking and belt-to-bed contact before repeat ordering.<\/p>\n<h2 id=\"conclusion\">Conclusion<\/h2>\n<p>The essential vacuum conveyor belt specification combines the <strong>product footprint, vacuum-bed zones, perforation layout and finished belt construction<\/strong>. Hole size alone does not establish suitability, and a matching belt width does not confirm the same hold-down performance.<\/p>\n<p>For an initial LKBELT technical review, share the existing belt or drawing, machine reference, both-face and joint photographs, perforation dimensions and active vacuum-zone details. The supplier can then confirm which base belt and processing requirements are within scope before a replacement construction is approved. Do not assume system design, pump selection or vacuum performance is part of a belt-only quotation.<\/p>","protected":false},"excerpt":{"rendered":"<p>A packaging line carries thin printed sheets beneath a camera. After a replacement belt is fitted, the sheets shift sideways [&hellip;]<\/p>","protected":false},"author":1,"featured_media":3675,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[309],"tags":[],"class_list":["post-7092","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Vacuum Conveyor Belt: Hole Patterns &amp; OEM Selection<\/title>\n<meta name=\"description\" content=\"Specify a vacuum conveyor belt by hole size, pitch, vacuum-zone layout, materials, joints and finished dimensions. Use the OEM replacement RFQ checklist.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.lkbelt.com\/zh\/vacuum-conveyor-belt-hole-patterns\/\" \/>\n<meta property=\"og:locale\" content=\"zh_CN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vacuum Conveyor Belt: Hole Patterns &amp; OEM Selection\" \/>\n<meta property=\"og:description\" content=\"Specify a vacuum conveyor belt by hole size, pitch, vacuum-zone layout, materials, joints and finished dimensions. Use the OEM replacement RFQ checklist.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.lkbelt.com\/zh\/vacuum-conveyor-belt-hole-patterns\/\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=100065289171531\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-21T07:44:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-21T10:17:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.lkbelt.com\/wp-content\/uploads\/2025\/11\/IMG_1748.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"750\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"LKBELT Team\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u4f5c\u8005\" \/>\n\t<meta name=\"twitter:data1\" content=\"LKBELT Team\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 \u5206\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/vacuum-conveyor-belt-hole-patterns\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/vacuum-conveyor-belt-hole-patterns\\\/\"},\"author\":{\"name\":\"LKBELT Team\",\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/#\\\/schema\\\/person\\\/8685a57f08cb86c5a1c655392bdaa9b1\"},\"headline\":\"Vacuum Conveyor Belts: Hole Patterns, Materials and Replacement Specifications\",\"datePublished\":\"2026-11-21T07:44:34+00:00\",\"dateModified\":\"2026-11-21T10:17:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/vacuum-conveyor-belt-hole-patterns\\\/\"},\"wordCount\":2920,\"publisher\":{\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/vacuum-conveyor-belt-hole-patterns\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lkbelt.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/IMG_1748.jpg\",\"articleSection\":[\"Industry News\"],\"inLanguage\":\"zh-Hans\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/vacuum-conveyor-belt-hole-patterns\\\/\",\"url\":\"https:\\\/\\\/www.lkbelt.com\\\/vacuum-conveyor-belt-hole-patterns\\\/\",\"name\":\"Vacuum Conveyor Belt: Hole Patterns & OEM Selection\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/vacuum-conveyor-belt-hole-patterns\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/vacuum-conveyor-belt-hole-patterns\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lkbelt.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/IMG_1748.jpg\",\"datePublished\":\"2026-11-21T07:44:34+00:00\",\"dateModified\":\"2026-11-21T10:17:56+00:00\",\"description\":\"Specify a vacuum conveyor belt by hole size, pitch, vacuum-zone layout, materials, joints and finished dimensions. Use the OEM replacement RFQ checklist.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/vacuum-conveyor-belt-hole-patterns\\\/#breadcrumb\"},\"inLanguage\":\"zh-Hans\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.lkbelt.com\\\/vacuum-conveyor-belt-hole-patterns\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-Hans\",\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/vacuum-conveyor-belt-hole-patterns\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.lkbelt.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/IMG_1748.jpg\",\"contentUrl\":\"https:\\\/\\\/www.lkbelt.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/IMG_1748.jpg\",\"width\":750,\"height\":800,\"caption\":\"White perforated belt with repeated large cutouts and small edge holes\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/vacuum-conveyor-belt-hole-patterns\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.lkbelt.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Industry News\",\"item\":\"https:\\\/\\\/www.lkbelt.com\\\/category\\\/industry-news\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Vacuum Conveyor Belts: Hole Patterns, Materials and Replacement Specifications\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/#website\",\"url\":\"https:\\\/\\\/www.lkbelt.com\\\/\",\"name\":\"lkbelt\",\"description\":\"Industrial belts Conveyor belts Reveal High - quality and Durable Conveyor Belts, Transmission Belts, Nylon Flat Belts and Timing Belts,lkbelt,Explore belts of different materials for diverse industrial transmission scenarios\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.lkbelt.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-Hans\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/#organization\",\"name\":\"lkbelt\",\"url\":\"https:\\\/\\\/www.lkbelt.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-Hans\",\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.lkbelt.com\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/liboicon1.png\",\"contentUrl\":\"https:\\\/\\\/www.lkbelt.com\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/liboicon1.png\",\"width\":200,\"height\":200,\"caption\":\"lkbelt\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/profile.php?id=100065289171531\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.lkbelt.com\\\/#\\\/schema\\\/person\\\/8685a57f08cb86c5a1c655392bdaa9b1\",\"name\":\"LKBELT Team\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-Hans\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0baaf4c38117f4c0caa112518966e4406aebfe5a471c8973a910840cb2baef1b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0baaf4c38117f4c0caa112518966e4406aebfe5a471c8973a910840cb2baef1b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0baaf4c38117f4c0caa112518966e4406aebfe5a471c8973a910840cb2baef1b?s=96&d=mm&r=g\",\"caption\":\"LKBELT Team\"},\"sameAs\":[\"https:\\\/\\\/www.lkbelt.com\\\/\"],\"url\":\"https:\\\/\\\/www.lkbelt.com\\\/zh\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Vacuum Conveyor Belt: Hole Patterns & OEM Selection","description":"Specify a vacuum conveyor belt by hole size, pitch, vacuum-zone layout, materials, joints and finished dimensions. Use the OEM replacement RFQ checklist.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.lkbelt.com\/zh\/vacuum-conveyor-belt-hole-patterns\/","og_locale":"zh_CN","og_type":"article","og_title":"Vacuum Conveyor Belt: Hole Patterns & OEM Selection","og_description":"Specify a vacuum conveyor belt by hole size, pitch, vacuum-zone layout, materials, joints and finished dimensions. Use the OEM replacement RFQ checklist.","og_url":"https:\/\/www.lkbelt.com\/zh\/vacuum-conveyor-belt-hole-patterns\/","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=100065289171531","article_published_time":"2026-11-21T07:44:34+00:00","article_modified_time":"2026-11-21T10:17:56+00:00","og_image":[{"width":750,"height":800,"url":"https:\/\/www.lkbelt.com\/wp-content\/uploads\/2025\/11\/IMG_1748.jpg","type":"image\/jpeg"}],"author":"LKBELT Team","twitter_card":"summary_large_image","twitter_misc":{"\u4f5c\u8005":"LKBELT Team","\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4":"15 \u5206"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.lkbelt.com\/vacuum-conveyor-belt-hole-patterns\/#article","isPartOf":{"@id":"https:\/\/www.lkbelt.com\/vacuum-conveyor-belt-hole-patterns\/"},"author":{"name":"LKBELT Team","@id":"https:\/\/www.lkbelt.com\/#\/schema\/person\/8685a57f08cb86c5a1c655392bdaa9b1"},"headline":"Vacuum Conveyor Belts: Hole Patterns, Materials and Replacement Specifications","datePublished":"2026-11-21T07:44:34+00:00","dateModified":"2026-11-21T10:17:56+00:00","mainEntityOfPage":{"@id":"https:\/\/www.lkbelt.com\/vacuum-conveyor-belt-hole-patterns\/"},"wordCount":2920,"publisher":{"@id":"https:\/\/www.lkbelt.com\/#organization"},"image":{"@id":"https:\/\/www.lkbelt.com\/vacuum-conveyor-belt-hole-patterns\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lkbelt.com\/wp-content\/uploads\/2025\/11\/IMG_1748.jpg","articleSection":["Industry News"],"inLanguage":"zh-Hans"},{"@type":"WebPage","@id":"https:\/\/www.lkbelt.com\/vacuum-conveyor-belt-hole-patterns\/","url":"https:\/\/www.lkbelt.com\/vacuum-conveyor-belt-hole-patterns\/","name":"Vacuum Conveyor Belt: Hole Patterns & OEM Selection","isPartOf":{"@id":"https:\/\/www.lkbelt.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.lkbelt.com\/vacuum-conveyor-belt-hole-patterns\/#primaryimage"},"image":{"@id":"https:\/\/www.lkbelt.com\/vacuum-conveyor-belt-hole-patterns\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lkbelt.com\/wp-content\/uploads\/2025\/11\/IMG_1748.jpg","datePublished":"2026-11-21T07:44:34+00:00","dateModified":"2026-11-21T10:17:56+00:00","description":"Specify a vacuum conveyor belt by hole size, pitch, vacuum-zone layout, materials, joints and finished dimensions. Use the OEM replacement RFQ checklist.","breadcrumb":{"@id":"https:\/\/www.lkbelt.com\/vacuum-conveyor-belt-hole-patterns\/#breadcrumb"},"inLanguage":"zh-Hans","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.lkbelt.com\/vacuum-conveyor-belt-hole-patterns\/"]}]},{"@type":"ImageObject","inLanguage":"zh-Hans","@id":"https:\/\/www.lkbelt.com\/vacuum-conveyor-belt-hole-patterns\/#primaryimage","url":"https:\/\/www.lkbelt.com\/wp-content\/uploads\/2025\/11\/IMG_1748.jpg","contentUrl":"https:\/\/www.lkbelt.com\/wp-content\/uploads\/2025\/11\/IMG_1748.jpg","width":750,"height":800,"caption":"White perforated belt with repeated large cutouts and small edge holes"},{"@type":"BreadcrumbList","@id":"https:\/\/www.lkbelt.com\/vacuum-conveyor-belt-hole-patterns\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.lkbelt.com\/"},{"@type":"ListItem","position":2,"name":"Industry News","item":"https:\/\/www.lkbelt.com\/category\/industry-news\/"},{"@type":"ListItem","position":3,"name":"Vacuum Conveyor Belts: Hole Patterns, Materials and Replacement Specifications"}]},{"@type":"WebSite","@id":"https:\/\/www.lkbelt.com\/#website","url":"https:\/\/www.lkbelt.com\/","name":"lkbelt","description":"Industrial belts Conveyor belts Reveal High - quality and Durable Conveyor Belts, Transmission Belts, Nylon Flat Belts and Timing Belts,lkbelt,Explore belts of different materials for diverse industrial transmission scenarios","publisher":{"@id":"https:\/\/www.lkbelt.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.lkbelt.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-Hans"},{"@type":"Organization","@id":"https:\/\/www.lkbelt.com\/#organization","name":"lkbelt","url":"https:\/\/www.lkbelt.com\/","logo":{"@type":"ImageObject","inLanguage":"zh-Hans","@id":"https:\/\/www.lkbelt.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.lkbelt.com\/wp-content\/uploads\/2024\/05\/liboicon1.png","contentUrl":"https:\/\/www.lkbelt.com\/wp-content\/uploads\/2024\/05\/liboicon1.png","width":200,"height":200,"caption":"lkbelt"},"image":{"@id":"https:\/\/www.lkbelt.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=100065289171531"]},{"@type":"Person","@id":"https:\/\/www.lkbelt.com\/#\/schema\/person\/8685a57f08cb86c5a1c655392bdaa9b1","name":"LKBELT Team","image":{"@type":"ImageObject","inLanguage":"zh-Hans","@id":"https:\/\/secure.gravatar.com\/avatar\/0baaf4c38117f4c0caa112518966e4406aebfe5a471c8973a910840cb2baef1b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/0baaf4c38117f4c0caa112518966e4406aebfe5a471c8973a910840cb2baef1b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0baaf4c38117f4c0caa112518966e4406aebfe5a471c8973a910840cb2baef1b?s=96&d=mm&r=g","caption":"LKBELT Team"},"sameAs":["https:\/\/www.lkbelt.com\/"],"url":"https:\/\/www.lkbelt.com\/zh\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.lkbelt.com\/zh\/wp-json\/wp\/v2\/posts\/7092","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lkbelt.com\/zh\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lkbelt.com\/zh\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lkbelt.com\/zh\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lkbelt.com\/zh\/wp-json\/wp\/v2\/comments?post=7092"}],"version-history":[{"count":3,"href":"https:\/\/www.lkbelt.com\/zh\/wp-json\/wp\/v2\/posts\/7092\/revisions"}],"predecessor-version":[{"id":7101,"href":"https:\/\/www.lkbelt.com\/zh\/wp-json\/wp\/v2\/posts\/7092\/revisions\/7101"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lkbelt.com\/zh\/wp-json\/wp\/v2\/media\/3675"}],"wp:attachment":[{"href":"https:\/\/www.lkbelt.com\/zh\/wp-json\/wp\/v2\/media?parent=7092"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lkbelt.com\/zh\/wp-json\/wp\/v2\/categories?post=7092"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lkbelt.com\/zh\/wp-json\/wp\/v2\/tags?post=7092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}